![]() Compared to the Management Contracting (MC) system, the Client still enters in a contractual relationship with the Contractors (Masterman, 2002). The system ensures that the Contractor and the Architect are put on an equal footing before the Client, and that the Construction Manager is able to provide design advice, particularly in regards to buildability. Under the CM system, the Client employs an Architect and a Construction Manager, who oversees the works of individual Contractors (Smith, 2003). Within the management-orientated system, the solution proposed is Construction Management (CM).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |